One of the BukSU vehicles broke down along Carmen road in Cotabato as the CILC Training Teams traveled to Tacurong City on September 11, 2009. The two vehicles stopped to assess the damage to the affected vehicle. While the drivers attempted to repair the broken water line of the engine and to avoid more delay, Assistant Project Manager Dante S. Victoria Jr. decided that half of the team goes ahead with the other vehicle to find a van for hire in Kabacan so the other vehicle could go back and fetch the rest of the team. Fortunately, after about an hour, the damaged van was back to running condition minus the aircon. Amidst the obstacle, the rest of the team still managed to reach their destination safely. Even though there was a delay, what was important was that all the team members were safe and sound.
This only proves that there is no guarantee in everything. Though the team had rigid preparations, problems are still inevitable. What is important in the situation is that the team still managed to respond accordingly to the scenario. There is no such thing as perfect, but there will always be chances to make things right.
No comments:
Post a Comment